Financial Planning

How to Model a Hire Before You Make It

YourCFO Team
hiringheadcount planningfinancial modelrunway

Most hires go into the model as one line: salary times twelve. That line is wrong in at least three directions. It understates the cost, it puts the cost in the wrong months, and it says nothing about when the hire starts paying for itself.

The point of modelling a hire before you make it is to see the company with and without that person, side by side, before the offer letter goes out. We have written about what a bad hire really costs. This piece is the step before that one: building the hire into the model so the decision is visible while it is still a decision.

Start from the loaded monthly cost

The offer letter is the smallest number in this exercise. On top of salary sit the statutory employer contributions, and they differ by country. In Malaysia, EPF alone is 12 or 13 percent of salary depending on the wage band, before SOCSO and EIS. In Singapore, CPF for an employee aged 55 or under is 17 percent up to the wage ceiling. The Philippines, Indonesia and Thailand each have their own stack. We keep the employer contributions for all five countries side by side so you do not have to rebuild the table every time.

Then add the costs that follow a person around: medical cover, software seats, a share of office or co-working, and any allowance in the contract. Put all of it in one loaded monthly cost per role. If your model has a headcount tab, this is the number it should carry, not the salary.

Put in the start month, not the approval month

A role approved in January rarely starts in January. Posting, interviews, an offer, and then a notice period that for a senior hire in KL or Singapore is commonly one to three months. Model the month the person actually starts.

This matters in both directions. It lowers this year's cost, which can make a hire look cheaper than it is if you only read the annual total. And it pushes the full run rate into next year, which is where the runway question really sits.

Keep one-off costs on their own line

Recruiter fees, a laptop, a sign-on bonus, relocation if there is any. Say a recruiter charges a fifth of annual salary on a RM15,000 a month hire: that is RM36,000 in the start month. Spread across the year it disappears into the run rate. Kept on its own line, it shows up as the cash hit it actually is, in the month it actually lands.

Model the ramp, not day-one output

Cost starts on the first day. Output does not. A salesperson closes nothing in month one, builds pipeline in months two and three, and might reach full quota around month six. An engineer takes time to ship on an unfamiliar codebase.

So if the hire is meant to drive revenue, the revenue line should ramp too. Picture a seed company in Singapore hiring an account executive and modelling full quota from the start date. The forecast looks fine for six months, then the actuals arrive and the gap between the two is the ramp nobody modelled. Put a simple ramp in: a percentage of full output by month, reaching 100 percent when you honestly expect it to.

Write down the trigger and the review date

Every hire should carry a reason in the model, written as something you can check. Pipeline above a level the current team cannot work. Support load above what one person can answer. A product milestone that needs a second engineer. Then set the month you will compare the result against your actual books.

This is what turns a hiring plan into something you manage rather than something you file. It is also the part of planning a hire that most models skip, because a one-off model built for a board meeting is never opened again to run the check. The check only happens if the forecast is reconciled to actuals every month, which is the whole argument for budget versus actuals done properly.

Read the runway line, not the hire line

Once the hire is in, the question the board cares about is not what it costs. It is how many months of runway it moves. Run two versions of the forecast, with the hire and without it, and compare the month cash runs out.

If the hire moves runway by two months and the trigger is met, that is an easy conversation. If it moves runway by six months on the strength of a ramp you have not tested, it is a different conversation, and it is better to have it with yourself first. Our guide to burn rate versus runway covers how to read that line.

Takeaway

Model every planned hire with five things: a loaded monthly cost that includes employer contributions, the real start month, one-off costs on their own line, a ramp for output, and a written trigger with a review date. Then compare runway with and without the hire before the offer goes out.

If you want a starting point, the B2B SaaS financial model template has a headcount tab with SEA employer on-costs already built in, and a runway view that shows exactly what each hire does to the month cash runs out.

Keep reading